History
-
- 2015
- MaySupplied materials to Ui-Sinseol Light Rail the third-rail power line
- Supplied materials to Seoul Ui-Sinseol Light Rail 24.854-km section (third-rail power line, BLS, EDS)
- '15.05~'15.12
-
- 2013
- DecParticipated in the third-rail power line optimization project (joint)
- Optimization and performance improvement of the facilities of an urban-type magnetic levitation railway track (Korean Agency for Infrastructure Technology Advancement)
- '13.12~'16.08
- OctBusan–Gimhae Light Rail power line pilot installation
- Material production and construction for a garage vehicle storage track
- '13.10~'14.06
-
- 2012
- JulASTA Type Test of a steel-wheel power line
- International Short-Circuit Testing Agency ASTA 100 kA / 1s
- JulKERI Type Test of a steel-wheel power line
- Korea Electrotechnology Research Institute (KERI) 82 kA / 1s
- MarMaterial supply contract for the Ui-Sinseol Light Rail third-rail power line
- Material supply contract for the Seoul Ui-Sinseol Light Rail 24-km section third-rail power line
-
- 2011
- MarJoint development agreement with POSCO ICT Co., Ltd.
- Concluded a joint development agreement for the third-rail power line facility
- '07.12
-
- 2010
- MaySupplied a magnetic levitation power line to Incheon International Airport
- Supplied a power line to the 6.3-km section magnetic levitation railway of Incheon International Airport
- '10.11~'12.03
- NovDeveloped a power line manufacturing facility for steel wheels
- Prepared design criteria and specifications, prototype manufacturing, and performance testing
- '10.11~'12.06
-
- 2009
- NovConstructed test lines for the Korea Institute of Machinery & Materials
- Supplied a power line to the 1.3-km magnetic levitation test line section of the Korea Institute of Machinery & Materials in Daejeon
- '09.11~'10.03
-
- 2008
- SepUrban Magnetic Levitation Train Commercialization Project
- Participated in the R&D project of the Korea Institute of Construction Technology / study on the safety and reliability of the third-rail equipment (entrusted participation)
- '08.09~'12.06
-
- 2007
- DecBusiness partnership agreement with POSCO ICT Co., Ltd.
- Partnership agreement on overall business related to power line facilities
- '11.03
- JunStarted the R&D of the basic power line at POSCO ICT Co., Ltd.
- Prepared the design criteria and specifications, prototype manufacturing, and performance testing
- '07.05~'08.06